Pre-engineered building design

Steel buildings for warehouses, factories, workshops and showrooms, from frame design in ETABS to fabrication-ready Tekla models and shop drawings.

What a pre-engineered building is

A pre-engineered building (PEB) is a steel building whose frames, purlins and cladding are designed as a system and fabricated in a factory, then bolted together on site. Tapered frames put steel only where the forces need it, so PEBs are light, quick to erect and economical for large clear spans: warehouses, factories, workshops, cold stores, showrooms and sports halls.

Our PEB design and detailing

  • Building layout and frame spacing
  • Primary frames: rafters and columns
  • Purlins, girts and sag rods
  • Roof and wall bracing
  • Crane runway beams and brackets
  • Mezzanine floors and staircases
  • Canopies and fascia
  • Base plates and anchor bolts
  • Cladding, roofing and skylights
  • Tekla 3D model and drawings

From design to fabrication

We design the structure in ETABS for dead, live, wind, crane and earthquake loads to IS 800 and IS 875, then model it in Tekla Structures. Tekla produces the drawings fabricators need: general arrangement and erection drawings, assembly and part drawings, and material lists, all taken from the same model so they match.

DeliverableWhat you get
Design calculationsFrame analysis and member design report
Anchor bolt planBolt layout, base plate details and foundation reactions for the foundation designer
General arrangementPlans, elevations and sections of the building
Erection drawingsMember marks and erection sequence for site
Shop drawingsAssembly and part drawings for fabrication
Material take-offSteel tonnage, bolts and sheeting quantities

Built for coastal and harsh environments

Near the sea, salt-laden air corrodes steel quickly, and many regions bring strong winds and heavy rain. We specify suitable surface preparation and paint systems, check uplift on roofs and cladding, and detail connections that drain rather than trap water. We also design the RCC foundations for the frames.

Frequently asked questions

Something else you'd like to know? Ask us.

What is the difference between PEB and conventional steel buildings?

A PEB uses tapered built-up frames designed as a system, so steel is used only where needed and the building is lighter. Conventional steel buildings use standard rolled sections, which suit smaller or more irregular structures.

Do you provide Tekla detailing for fabricators?

Yes. We produce Tekla models with general arrangement, erection, assembly and part drawings and material lists, and can export NC files for fabrication machines on request.

Can you design a PEB with an overhead crane?

Yes. We design crane runway beams, brackets and the frames for the crane loads and the deflection limits the crane supplier specifies.

Do you design the foundations for the PEB?

Yes. We provide the anchor bolt plan and can also design the RCC foundations and floor slab.

Have drawings ready, or just an idea? Send them over.

Share the location, building type and what you need. We reply within one working day.