Marine and Subsea Engineering

Route engineering, burial and protection, shore landings and installation engineering for submarine power and telecom cables, pipelines, outfalls and intakes, from IMI Design, a division of Infra Marine Innovations.

Cable landfall and route profile Beach jointDrilled landfall (HDD) Buried in a trench, depth set by the burial assessmentSea

What we do

Engineering from the first desktop study to the as-laid records, for owners, EPC contractors and installers who need the route and the installation right the first time.

Route engineering

Desktop studies, route options and the final route: seabed and geology, existing cables and pipelines, anchorages, fishing, shipping and protected areas, crossings and the survey scope needed to fix the route.

Burial and protection

Burial assessment for the soil and the threats along the route, target burial depth, and rock, mattress or duct protection where burial isn't possible.

Shore landings

Landfall design by horizontal directional drilling (HDD) or open trench: the drill profile, duct sizing, pulling loads, the beach joint pit and the coastal clearances.

Installation engineering

Lay and pull-in analysis, tension and bend limits, the vessel and equipment needed, installation procedures and the method statements for approval.

Pipeline design checks

Wall thickness, on-bottom stability, free spans, pipe–soil interaction and crossings for submarine pipelines, outfalls and intakes.

Outfalls and intakes

Seawater intake and outfall pipelines for desalination, industry and treated effluent: hydraulics, diffuser layout, route and installation.

Site supervision

The owner's engineer at sea and on the shore during installation, with daily reports and the as-laid records.

How a project runs

Each stage can be taken on its own, or as one package carried through to installation.

  1. Desktop study

    Existing data, constraints and route options, and what the survey must find out.

  2. Survey scope and review

    The geophysical and geotechnical survey specification, and review of the results.

  3. Route and burial design

    The engineered route, crossings, burial depth and protection, and the landfall design.

  4. Installation engineering

    Analysis, procedures and the documents the contractor and the authorities need.

  5. Installation and as-laid

    Supervision during the work and the as-laid route, depth of burial and records for the owner.

Who we work with

Port and maritime authorities, power utilities and transmission companies, telecom cable owners, EPC contractors and installers, desalination plants and industries with seawater intakes or outfalls, and developers of offshore and coastal projects.

Standards

StandardCovers
DNV-ST-F101Submarine pipeline systems
DNV-RP-F109On-bottom stability of submarine pipelines
DNV-RP-F105Free spanning pipelines
DNV-RP-F114Pipe–soil interaction
DNV-RP-0360Subsea power cables in shallow water
IEC 63026Submarine power cables, 6 kV to 60 kV
ICPC recommendationsCable route planning, crossings and proximity to other cables and pipelines

In India, a submarine cable or pipeline also needs Coastal Regulation Zone (CRZ) clearance, which covers the shore and the sea up to 12 nautical miles, as well as permissions from the port and maritime authorities along the route. We prepare the route drawings, engineering reports and technical details these applications need.

Frequently asked questions

Something else you'd like to know? Ask us.

What does a submarine cable route study include?

A desktop study of the seabed, geology, existing cables and pipelines, anchorages, fishing and shipping, and protected areas, comparing route options and setting out the survey needed to fix the final route.

How deep should a submarine cable be buried?

It depends on the soil and the threats along the route, mainly anchors, fishing gear and dredging. A burial assessment sets the target depth section by section, with rock or mattress protection where burial isn't achievable.

What is an HDD landfall?

A shore landing made by horizontal directional drilling: a duct is drilled under the beach and the shore protection, and the cable or pipe is pulled through it, leaving the beach undisturbed.

Do you supervise installation at sea?

Yes. We act as the owner's engineer during installation, with daily reports and the as-laid records, charged per engineer per day.

Planning a cable or pipeline landfall? Talk to us early.

Route and landfall decisions made at the start cost far less than changes at sea.