MEP & Fire
Fire NOC in Goa: Which Buildings Need Sprinklers, Hydrants and Fire Alarms?
Getting a fire NOC in Goa: how NBC 2016 Part 4 decides which buildings need sprinklers, hydrants and fire alarms, and how to prepare the drawings.
We design the fire fighting and fire alarm systems for your building and prepare the drawings, calculations and Form I details for the fire NOC from the Directorate of Fire & Emergency Services.
A fire NOC application has two halves. The architect's drawings show the means of escape: staircases, exits, travel distances, corridor widths, fire doors and access for the fire tender. The fire protection drawings show the systems that detect and fight a fire. We prepare the second half and check the first with your architect so that the two agree.
| Drawing or document | What it shows |
|---|---|
| Fire fighting layouts | Every floor with hose reels, landing valves, downcomer or wet riser, sprinklers where required, extinguishers and pipe sizes |
| Schematic and riser diagram | The whole system from the fire tank and pumps to the top floor, with valves, pressures and pipe sizes |
| Tank and pump calculations | Fire water storage, terrace tank where needed, pump duty and head, and the jockey and standby pumps |
| Fire alarm layouts | Detectors, call points, sounders, the panel location and the cable route, zone by zone |
| Pump room and tank details | Plan and sections of the pump room and tank with suction, delivery and test lines |
| Form I details | Height, floors, occupancy, areas, exits, staircases and systems, taken from the same drawings so the figures match |
The fire NOC comes in two stages. The initial (provisional) NOC is applied for with the drawings before construction, together with the Form I questionnaire. The final NOC follows once the system has been installed, inspected and tested, and the building needs it before it is occupied. We stay on the project between the two, answering the department's queries and checking the contractor's shop drawings.
Our article on applying for the initial fire NOC in Goa with Form I goes through the process step by step.
The National Building Construction Standards 2026 (SP 7:2026) replaced NBC 2016 on 30 April 2026. Under NBCS 2026 the enhanced fire and life safety requirements for residential buildings start at 24 m instead of 15 m, and much of the text is now advisory. The fire department decides which edition it applies and may keep stricter rules, so we confirm the basis with the department before the design is fixed. See what NBCS 2026 changes for building services.
The systems depend on the building's use, height and floor area, and on whether it has a basement. A small house needs very little. Apartment blocks need more as they get taller: downcomers, then wet risers and sprinklers. Hotels, hospitals, schools, shopping areas and industrial buildings have their own thresholds. Our guide to which buildings need sprinklers, hydrants and fire alarms covers the main cases.
See the drawings from our fire protection design for a building in Dabolim. We take on fire NOC work across Goa, including Margao, Panaji, Mapusa and Porvorim and Ponda.
Articles from our engineers on building on the west coast. All articles

MEP & Fire
Getting a fire NOC in Goa: how NBC 2016 Part 4 decides which buildings need sprinklers, hydrants and fire alarms, and how to prepare the drawings.

MEP & Fire
NBCS 2026 (SP 7:2026) replaced NBC 2016 in April 2026. What changed for fire, electrical and plumbing design, and what it means for projects in Goa.

MEP & Fire
A step-by-step guide to the initial fire NOC in Goa: what Form I asks, which drawings to attach, and the queries that most often hold up an application.
Something else you'd like to know? Ask us.
The Directorate of Fire & Emergency Services, Government of Goa. The initial NOC is applied for with the drawings before construction, and the final NOC after the installation has been inspected and tested.
Form I is the questionnaire submitted with the application for the initial fire NOC in Goa. It records the building's height, floors, occupancy, areas, staircases, exits and fire protection systems. We fill it in from the same drawings and calculations we submit, so the figures agree.
It depends on the use, height, floor area and any basement. Under NBCS 2026 the enhanced requirements for residential buildings start at 24 m, but the fire department decides which code edition it applies. Send us the drawings and we'll tell you.
Your architect or the owner normally makes the application. We prepare the fire protection drawings, calculations and Form I details, help answer the department's queries, and attend the inspection if you need us.
For a typical apartment building, about one to two weeks after we receive the final architectural drawings.
Tell us the building's use and number of floors. We'll confirm the systems it needs and send a quotation.