On 30 April 2026 the Bureau of Indian Standards withdrew the National Building Code of India 2016 (SP 7:2016) and replaced it with the National Building Construction Standards 2026 (SP 7:2026), usually shortened to NBCS 2026. For anyone designing or approving buildings, it is the biggest change to the national reference document in a decade.

This article sets out what has changed so far, what hasn't, and how we are handling it on projects in Goa.

This is a general guide based on what has been published about the new standard. Always confirm which edition your approving authority applies, and check the clauses that matter to your building in the standard itself.

The headline changes

A "standard", not a "code"

The name change matters. The National Building Code was widely treated as binding, and the word "code" led to arguments, and court cases, about whether every clause was mandatory. NBCS 2026 is published as a set of standards and guidance. Building construction and fire safety are State subjects in India, so it is the State's building bye-laws, the municipality and the fire department that decide what is compulsory.

Performance-based design

NBC 2016 was largely prescriptive: it told you the pipe size, the travel distance and the fire rating, and if you followed the rule you complied. NBCS 2026 moves towards a performance-based approach. A designer can propose an alternative layout or material if they can show, with calculations, test data or certified products, that the building performs as well.

That gives good designers more freedom. It also moves the burden of proof onto the design team: the drawings and calculations have to show the reasoning, not just the rule.

"Shall" became "should" in fire and life safety

In the fire and life safety part, much of the mandatory "shall" wording has become "should". Read on its own, that sounds like a relaxation. In practice, a fire department can still require any of it, and most will keep asking for the systems they are used to.

The residential high-rise threshold moved from 15 m to 24 m

This is the change that affects most Goa projects. Under NBC 2016, a residential building of 15 m or more counted as high-rise and attracted the full set of fire and life safety requirements. Under NBCS 2026 the enhanced requirements for residential buildings start at 24 m, roughly eight storeys.

A stilt-plus-five or stilt-plus-six apartment block, which sits between 15 m and 24 m, is exactly the kind of building being built across Margao, Vasco, Porvorim and Ponda. Under the new standard it may no longer automatically need everything a high-rise needs.

What this means for each service

Fire protection

For residential buildings between 15 m and 24 m, the main question is whether the fire department applies the new threshold. Until it confirms, we design to the department's current practice and show what the NBCS position would allow, so the client can see the difference in cost.

Buildings above 24 m, and non-residential buildings such as hotels, hospitals, offices, shops and assembly buildings, still need careful design to their own thresholds. Basements used for parking still need ventilation, and sprinklers depending on their size.

The fire NOC form used in Goa still refers to NBC 2016 and even NBC 2005 clauses in places. Where the clause references and the new standard disagree, we note the basis on the drawing and in the covering letter. Our article on applying for the initial fire NOC with Form I shows how the form is put together.

Electrical

The electrical part of the national code has always worked hand in hand with the National Electrical Code and the IS standards for wiring (IS 732), earthing (IS 3043) and lightning protection (IS/IEC 62305). Those standards still apply. What changes is the emphasis on showing the design basis: maximum demand, cable sizes, voltage drop, fault level and earthing calculations should be on the drawings, not just the result. See how we do electrical load calculations.

Plumbing and drainage

Water demand per person, storage, pipe sizing and drainage are still based on the familiar IS standards (IS 1172 for water demand, IS 1742 and IS 2065 for drainage and sanitation). Performance-based design is useful here too: rainwater harvesting, recycling of grey water and dual plumbing can be justified by calculation. Our guide to sizing a sump and overhead tank uses the same method.

HVAC

Car park and basement ventilation, smoke control and fresh air for occupied spaces remain the areas the fire department looks at. For comfort cooling, ASHRAE and ISHRAE methods for heat load are unchanged.

What hasn't changed

  • The State decides. Goa's building rules, the municipality or panchayat, the planning authority and the Directorate of Fire & Emergency Services decide what is compulsory for your building.
  • Stricter local rules still win. If a local rule asks for more than the national standard, the local rule applies.
  • Product standards still apply. Pipes, valves, hoses, cables and switchgear still need to meet their own IS standards. Some referenced standards have been renumbered or updated, so specifications should be checked.
  • Good design is still good design. A building that is easy to escape from, with water where the fire brigade needs it and an alarm people can hear, is what every edition is trying to achieve.

How we handle it on projects

  1. Confirm the basis first. At the start of a project we confirm which edition the fire department and the authority apply, and write it into the design basis.
  2. Show the calculations. Every package we issue lists the codes used and includes the calculations behind tank sizes, pump duties, cable sizes and earthing.
  3. Flag the choices. Where NBCS 2026 would allow a lighter system than the department's usual practice, we show both and let the client decide with the facts in front of them.
  4. Keep the drawings and the forms in step. The Form I answers, the drawings and the calculations come from the same data, so they can't disagree.

How we can help

IMI Design prepares fire protection, electrical and plumbing design for buildings across Goa, with the drawings for the fire NOC. If you're not sure what NBCS 2026 means for your building, send us the drawings and we'll tell you.