MEP design for architects

We fit the services around your design rather than the other way round: plant rooms, shafts and ceiling zones agreed early, approval drawings on time, and layouts your contractors can build.

What we give you at each stage

StageWhat you get from us
ConceptSizes and locations for the electrical room, transformer and DG, pump room, fire and domestic water tanks, STP, shafts and AC outdoor units, so they're in the plans before they're fixed
ApprovalsFire NOC drawings, electrical load details for the supply application, and rainwater harvesting and STP sizing for the building permission, in time for your submission
Working drawingsLayouts, risers, schematics and details for each service, coordinated with your reflected ceiling plans and the structure
ConstructionAnswers to contractor queries, review of shop drawings and material submittals, and site visits at key stages

What we need from you

  • Floor plans, sections and elevations, in DWG if you can
  • The area statement and building use
  • The site plan with the road, levels and existing services
  • Your interior and ceiling intent for the main spaces

Coordination, not just drawings

Most site problems with services come from things that weren't agreed early: a beam where a duct needs to go, a shaft that's too small, a ceiling that's too low for the sprinklers and the ducts together. We mark the openings and sleeves for your structural engineer, check ceiling zones against the duct and pipe sizes, and keep one set of services drawings that agree with each other.

Where we work

From our office in Vasco da Gama we take on projects across Goa and in Karnataka, Maharashtra and Kerala.

We are a young practice. Our completed projects so far are in Goa, and you can see the drawings from each one on our projects page. Every package is calculated, lists the codes it follows, and is prepared by the engineer you speak to.

Frequently asked questions

Something else you'd like to know? Ask us.

Can you work to our drawing standards?

Yes. Send us your title block, layer standard and sheet numbering, and we'll set up the services drawings to match.

How early should we bring you in?

At concept, before the plans are fixed. That's when plant rooms, shafts and tank sizes cost nothing to change.

Do you prepare the fire NOC drawings?

Yes. We design the fire systems and prepare the drawings for the fire authority, and you make the submission with the rest of the application.

How do you charge?

A fixed fee per service, based on the building and the scope, agreed in writing before we start. Send the drawings and we'll send a quotation.

Have a project coming up? Send us the drawings.

Share the location, building type and what you need. We reply within one working day.