Power, lighting and earthing for homes, apartments and commercial buildings, with every cable and breaker sized from a calculation.
Electrical design decides how much power a building needs, how it arrives and is distributed, and how it is kept safe. We start from the loads (flats, shops, lifts, pumps, air conditioning and common lighting), work out the maximum demand, and size the supply, transformer, standby generator, panels, cables and protection to suit.
Every cable is sized for the design current after derating for temperature and grouping, then checked for voltage drop over its length. Lighting is designed for the illuminance each room needs, and earthing for the soil resistivity and the fault current. The calculation sheets are issued with the drawings, so your contractor and the electrical inspector can see how each size was chosen.
The National Electrical Code of India, the Central Electricity Authority safety regulations, IS 732 for wiring, IS 3043 for earthing, IS 3646 for lighting and the building services part of SP 7:2026 (NBCS 2026). When a project specifies them, we design to IEC 60364, BS 7671, BS 7430 and EN 12464-1.
Most buildings need more than one service. Designing them together means they fit together.
Electrical, plumbing and HVAC from one team, with fire protection designed alongside, so the services share the shafts and ceilings instead of fighting for them.
Air conditioning and ventilation sized from room-by-room heat loads and fresh-air rates, with ducts sized by calculation.
Practical guides on this topic from our engineers. All articles

MEP & Fire
Why earthing is hard in Goa's laterite and coastal sand, how many earth pits a building needs, how to calculate the resistance, and when to test.

MEP & Fire
How to work out the connected load, maximum demand and transformer size for an apartment building, and what the electricity load sanction in Goa needs.

MEP & Fire
NBCS 2026 (SP 7:2026) replaced NBC 2016 in April 2026. What changed for fire, electrical and plumbing design, and what it means for projects in Goa.
Something else you'd like to know? Ask us.
Yes. We prepare the connected load and maximum demand calculation and the single-line diagram the utility asks for, and size the transformer and DG set where they are needed.
Yes. We design lighting room by room for the illuminance the space needs, choose the number of fittings by the lumen method, and lay them out on the drawings.
Yes. We size the earth electrodes from the soil resistivity and the conductors from the fault current, and lay out the lightning protection.
No. We are designers. We prepare the drawings and calculations and answer the electrical contractor's questions during construction.
Share the location, building type and what you need. We reply within one working day.