
MEP & Fire
How to Size the Sump and Overhead Tank for an Apartment Building
How big should the sump and overhead tank be? A worked example for an apartment building: water demand, storage split, fire reserve and the transfer pump.
Water supply and drainage for villas, apartment buildings and mixed-use buildings, with every pipe size worked out from a calculation.
A plumbing design decides how much water the building needs, where it is stored, how it reaches every tap at a usable pressure, and how waste and rainwater leave without smells, blockages or flooding. We design both systems from the architectural drawings, to the plumbing part of SP 7:2026 (NBCS 2026) or NBC 2016 Part 9, IS 2065 and IS 1172.
Pipe sizes come from fixture-unit calculations, tank sizes from the occupancy and daily demand, and pump duty from flow and head. The calculations are stated on the drawings, so your contractor and the authority can see how each size was chosen. On our Arossim villa, for example, demand for fourteen occupants set a 4,000 L underground tank, a 2,000 L overhead tank and a transfer pump at 6 m³/h and 20 m head.
NBCS 2026 (or NBC 2016 Part 9 where the authority still applies it), IS 2065 and IS 1172 on every project. When a project specifies them, we design to the Uniform or International Plumbing Code, or BS EN 806 and BS EN 12056, instead.
Most buildings need more than one service. Designing them together means they fit together.
Electrical, plumbing and HVAC from one team, with fire protection designed alongside, so the services share the shafts and ceilings instead of fighting for them.
Fire fighting and fire alarm systems sized to the building's height and use, with drawings for the fire NOC.
Practical guides on this topic from our engineers. All articles

MEP & Fire
How big should the sump and overhead tank be? A worked example for an apartment building: water demand, storage split, fire reserve and the transfer pump.

MEP & Fire
What MEP shop drawings are, how they differ from design drawings, what HVAC, plumbing, electrical and fire drawings show, and how to get approval.

Structural & PEB
What goes wrong when structural and MEP design are done separately, and five things to coordinate early: heights, beams, shafts, plant and openings.
Something else you'd like to know? Ask us.
The architectural plans and sections, the site location and the number of occupants or flats. If there's a municipal or panchayat supply, tell us its details too.
Yes. We size the solar heater from the hot water demand and add electric backup, as on our Arossim villa project.
Yes. We work from the current drawings and site conditions and route new services around what's built.
No. We are designers. We prepare the drawings and calculations, and answer your plumber's questions during construction.
Share the location, building type and what you need. We reply within one working day.