HVAC design consultants

Air conditioning and ventilation sized from the heat each room gains and the fresh air it needs, for Goa's hot, humid coastal climate.

What our HVAC design covers

HVAC design decides how much cooling each space needs, which system delivers it best, and how fresh air comes in and stale air, smoke and fumes go out. In Goa that means designing for high humidity as well as heat, and choosing outdoor equipment and coils that survive the salt air.

  • Heat load calculations, room by room
  • Split, VRF, ducted or chilled water system selection
  • Fresh air to ASHRAE 62.1 or ISHRAE
  • Duct sizing and layouts
  • Basement car park ventilation, with 12 air changes in a fire
  • Toilet, kitchen and plant room exhaust
  • Staircase and lift lobby pressurisation
  • Equipment schedules and electrical loads for the electrical design

Sized from calculations

Heat loads come from the glass, walls, roof, people, lights, equipment and fresh air of each room; ducts are sized by equal friction with velocity limits for quiet running; ventilation is sized from air changes or code rates for each space. The calculation sheets go out with the drawings.

Codes

ISHRAE guidance, the building services and fire parts of SP 7:2026 (NBCS 2026), and ASHRAE 62.1, ASHRAE 90.1 and the ASHRAE load calculation methods, with ECBC for energy where it applies.

What you receive

  • Cover sheet, drawing index and location plan
  • General notes, codes and abbreviations
  • Design basis and calculations
  • Site plan and floor layouts
  • Schematic and riser diagrams
  • Isometrics and enlarged details
  • Standard installation details
  • Testing and commissioning notes

Frequently asked questions

Something else you'd like to know? Ask us.

Which air conditioning system suits my building?

Split units suit small homes and offices, VRF suits villas, hotels and offices where rooms need separate control, and chilled water suits large buildings. We compare them for your building as part of the design. Our article on split, VRF or chilled water explains more.

Do basement car parks need mechanical ventilation?

Usually, yes. NBCS 2026 asks for basement ventilation that can give 12 air changes an hour in a fire, with normal running rates set by the building services part of the code. We size the fans and the fresh air inlets.

Do you design for Goa's humidity?

Yes. We size for the moisture load as well as the heat, so rooms are dry as well as cool, and specify coated coils and outdoor units suited to coastal air.

Do you supply or install air conditioning?

No. We are designers. We prepare the drawings and calculations and answer the HVAC contractor's questions during construction.

Have architectural drawings ready? Send them over.

Share the location, building type and what you need. We reply within one working day.