Every new building needs an electricity connection, and the size of that connection decides a lot: whether the building can be fed from the existing network or needs its own transformer, how big the meter room and cables are, and what the builder pays for the supply. All of it comes from one calculation: the maximum demand.

This article shows how we work it out for an apartment building, and how it feeds the load sanction.

The figures below are typical values for illustration. Supply rules, thresholds and charges are set by the Electricity Department and change from time to time, so check the current requirements before you apply.

Connected load: everything that could be switched on

The connected load is the sum of the ratings of everything connected: lights, fans, sockets, air conditioners, water heaters, kitchen appliances, pumps and lifts. We build it up room by room from the electrical layout, because the number of points and their ratings come from the layout, not from a rule of thumb.

Example: a 2 BHK flat in Goa.

Item Points Load
Lights and fans 20 1.0 kW
6 A sockets 14 1.4 kW
16 A sockets (kitchen, washing machine) 3 3.0 kW
Air conditioners (two bedrooms) 2 3.0 kW
Water heaters (two bathrooms) 2 4.0 kW
Connected load 12.4 kW

Maximum demand of one flat: not everything at once

Nobody runs every socket, both geysers and both ACs at the same moment. A demand factor is applied to each type of load, for example a high factor for lights and ACs, which run for long periods, and a low one for sockets and water heaters.

For the flat above, the maximum demand typically comes to about 6 to 7 kW, roughly half the connected load. This is what the flat's meter, the sub-main cable and the distribution board are sized for.

Maximum demand of the building: diversity between flats

Twenty-four flats don't all peak at the same moment either. A diversity factor between flats reduces the total further. The more flats, the lower the factor.

Example: 24 flats × 6.5 kW = 156 kW. With a diversity of about 0.5 between flats, that becomes 78 kW.

Then add the common loads, which don't get the same diversity:

  • Lift: 7.5 kW
  • Water transfer pumps (one working): 1.5 kW
  • Fire pumps: counted separately because they run only in a fire, but the supply and DG must be able to start them
  • Common lighting, gate, CCTV and intercom: 2 kW
  • Shops on the ground floor: 4 × 3 kW = 12 kW

Building maximum demand: about 78 + 7.5 + 1.5 + 2 + 12 ≈ 101 kW.

From kW to kVA, and the transformer

Supplies and transformers are rated in kVA. At a power factor of 0.9: 101 ÷ 0.9 ≈ 112 kVA.

A transformer shouldn't run flat out, both to allow for growth and to keep losses and temperature down. Loading it to about 80% suggests a 160 kVA transformer for this building, the next standard size up.

Whether the building needs its own transformer at all depends on the total demand and the Electricity Department's rules at the time. Small buildings are usually fed at low voltage from the existing network. Larger buildings usually need a transformer, a substation space on the plot and an HT connection. Ask the local sub-division office early, because a transformer and its clearances take real space on the site plan.

The standby generator

If the building has a DG set, decide what it backs up: usually lifts, pumps, common lighting and, if required, fire pumps. Size it for the running load plus the starting current of the largest motor. Full backup of every flat makes the DG several times bigger and is rarely worth it.

Cables, meters and the meter room

With the maximum demand known, the rest follows:

  • Main cable from the transformer or supply point, sized for current, voltage drop and fault level.
  • Meter room on the ground floor with one meter per flat and shop, plus common-area meters, with clear access for meter reading.
  • Rising mains or sub-main cables to each floor or flat, sized for the flat's maximum demand and the voltage drop over the run.
  • Distribution board in each flat, with circuits for lights, sockets, ACs and heaters, each with its MCB and an RCCB.

We draw this as a riser diagram from the transformer and DG to every meter and every flat board, with the cable sizes and breaker ratings on it.

The load sanction

The application for the supply sets out the load the building needs. It usually includes:

  • The connected load and maximum demand, with the calculation.
  • The number of meters (flats, shops, common services) and the load on each.
  • The single-line diagram of the installation.
  • The site plan showing the meter room, and the transformer location if there is one.
  • For HT installations, the drawings for approval by the Electrical Inspectorate under the CEA safety regulations.

A clear calculation answers most of the questions before they are asked.

Earthing

Every installation needs a properly designed earthing system: earth pits for the transformer neutral and body, the DG, the main earth bar, the lift and the pumps, and a protective conductor to every flat. Goa's laterite and coastal soils make this harder than it sounds. See our article on earthing design in Goa.

How we can help

IMI Design prepares electrical design for apartment buildings, villas, shops, offices and industrial units in Goa: point layouts, load and maximum demand, transformer and DG sizing, cable schedules, riser diagrams, earthing and the documents for the load sanction. Send us the architectural drawings for a quotation.

Tags Electrical Load calculation Transformer Load sanction Goa

Need help with a project like this?

Send us your drawings and we'll tell you what your building needs. We reply within one working day.