Fire NOC readiness check

Answer a few questions about your building and see what the fire department will look for under NBCS 2026, and what's still missing before you apply.

1. Your building

2. What you have planned or installed

Readiness

–

    An early check, not an approval. The fire department decides after reviewing the drawings.

    Get the full report and the fixes

    Our engineer reviews your answers and sends a short report on WhatsApp: what's missing, what it means for the design, and what to do next. Free, within one working day.

    What the fire department checks

    The fire NOC is decided on the drawings: the fire fighting systems the building's use and height call for, enough fire water kept apart from domestic water, pumps sized to the flow, detection and alarm, and the exits and access. Most queries come from a missing system, a shared tank with no protected fire reserve, or drawings without calculations.

    Read more in our guides on the initial fire NOC and sprinklers and hydrants, or see our fire NOC drawings service.

    Frequently asked questions

    Something else you'd like to know? Ask us.

    What does the fire department check for a NOC?

    The fire fighting and detection systems the building's use and height require, fire water storage and pumps, separation of fire water from domestic water, exits and access, and drawings with calculations.

    Is this check enough to apply?

    No. It shows what's likely missing. The application needs drawings and calculations for your building, prepared to the rules your fire authority applies.

    Which code does it use?

    NBCS 2026 (SP 7:2026) Part F. Some fire authorities still apply NBC 2016 or add their own conditions; we check which before the design.

    Applying for a fire NOC? Send us the drawings.

    We prepare the fire protection design and NOC drawings, and revise them if the department raises queries.