Electrical load calculator

Find the maximum demand, the kVA and the transformer size for an apartment or mixed-use building, from its flats, shops, lifts and pumps.

Your building

Results update as you type.

Result

–

    An estimate for early planning, not a design. Your building, site and authority can change the answer.

    How this calculator works

    • Each flat: a typical connected load and maximum demand by size, with split ACs in the bedrooms and electric water heaters: 1 BHK 4.5 kW, 2 BHK 6.5 kW, 3 BHK 8.5 kW, 4 BHK 11 kW of maximum demand
    • Diversity between flats: not every flat peaks at once, so the flats' total is multiplied by 0.7 for up to 10 flats, falling to 0.5 for 21 to 50 and 0.4 above 100
    • Shops, lifts, pumps and common areas: added in full, as they don't share the same diversity
    • kVA: maximum demand in kW divided by a power factor of 0.9
    • Transformer: the next standard size that carries the load at 80%, leaving room for growth
    • DG set: lifts, pumps and common areas, at 80% loading

    Our article on electrical load calculation and the load sanction explains each step with a worked example.

    More free calculators

    • MEP design fee estimate: An indicative fee for electrical, plumbing, HVAC and fire design, from your building's area and the services you need.
    • Fire NOC readiness check: Find what the fire department will look for in your building, and what's still missing before you apply.
    • AC tonnage calculator: What size of air conditioner a room needs, from its size, sun, roof and the people in it.
    • Water tank size calculator: Sump and overhead tank sizes and the transfer pump for an apartment building.
    • Fire water tank calculator: Fire systems, pump flow and fire water storage for a building, to NBCS 2026 Part F.

    Frequently asked questions

    Something else you'd like to know? Ask us.

    What is the maximum demand of a 2 BHK flat?

    Typically 6 to 7 kW, about half its connected load, because the ACs, water heaters and sockets are not all used at once.

    When does a building need its own transformer?

    When its demand is more than the supply company will give from the existing low-voltage network. The limit differs between supply companies, so ask the local office early in the design.

    What size transformer does a 24-flat building need?

    With four shops and a lift, about 112 kVA of demand, so a 160 kVA transformer loaded to about 70%.

    Want the real numbers for your building? Send us the drawings.

    We'll reply within one working day with what the building needs and a fixed fee for the design.